10/22/2006

Emergency Preparedness

I had to take a little time off from both the house and the blog. For reasons both personal and professional, I've been extremely stressed lately. I haven't made much progress on anything, and I figured that it would be better to take a break than to get burned out.

Another source of stress has been very personal. About 3 weeks ago, Shayne fractured his C6 vertebrae in a fall. It was just a hairline crack, but he has to wear a neck brace for up to 8 weeks. The doctor said that the brace is basically a preventative measure against further damage, and at the last check-up the doc said Shayne's healing fast, but he's restricted to "light duty" at work until released by the doctor. Because the department he works for is so small, there isn't much as far as light duty. In the meantime, he's taken up dispatching and has begun training and taking classes. Thankfully this keeps his paycheck coming in, and we don't have to worry about depleting our savings. God has been very good to us, and I appreciate the prayers and support from all our family and friends.

All of this has gotten me thinking about what would have happened to us if Shayne hadn't been able to work. Or what would happen if I couldn't work. We have a savings account, but it wouldn't last forever. It wouldn't even cover a major repair on the house if there was a big problem or a disaster of some sort. I'm sure we have enough in the pantry and freezer to get us through a week, but we'd be SOL if the power was out. Our well pump wouldn't function, and we'd have no water besides what's in the tanks and hot water heater.

After talking with Shayne, we've decided to set aside an area under the stairs and dedicate it to an emergency preparedness kit. Some guides recommend having a 1 year supply of food, but we're not going to go that far. I'd feel more than comfortable with about a month's supply of canned goods and pouched, canned, or freeze-dried meat; staples like flour, sugar, and salt; extra water; first aid supplies and extra batteries; and a way to stay warm and dry. Some of these things I already have due to my backpacking habit. I have a stove that runs on denatured alcohol, and sleeping bags and tents that could keep us warm and sheltered in sub-zero conditions. I have a water filter, and we're close enough to the lake that I could conceivably use it as our water source. I even have a little heater that runs on 16 oz propane cylinders. The food and batteries are something I'll have to work on...

A part of me feels a little paranoid for even thinking about this, but my complacent attitude wouldn't help us much if there was a bad blizzard and we were snowed in for any length of time. Or if one of us was out of work and we couldn't afford to buy groceries... In any case, I'd rather err on the side of paranoia, considering the alternative.

Here are a few links that I've found to be helpful:
Emergency Essentials
The American Red Cross
The Prepared Pantry

I'll keep you all updated as this project progresses...

9/06/2006

Still plugging away

I've made some progress on the living room woodwork (finally), and it should be all stripped and sanded by next week. We might even get the shellac on and get everything nailed back up. We'll see... Once everything is back in place, I'll put the final coat or two of shellac on the floor and wax it. Then I'll sit back and enjoy having a finished room for about 2.6 seconds before I start tearing up something else. *sigh* I really just can't leave well enough alone.

As an interim project while we're saving up for the bathroom or kitchen remodel (still haven't decided which will be first), I'm going to repaint the psychotically bright yellow and green front bedroom something a little more, umm, subdued. Like sage green with cream woodwork. Or maybe I'll get brave and strip it, too, even though it wasn't in our plan. Either way, that room is easy, since the walls and ceiling have already been repaired and are free of wallpaper and tiles.

If we're still broke after that, we can move on to the office. The work in there is less superficial, but still inexpensive. Same with the master bedroom. It seems there will always be plenty to do...

8/29/2006

Then again, maybe not

Just when I thought I had the next year in home improvement all laid out, we started talking again about remodeling the bathroom next instead of the dining room. Why would we do this? For starters, we HATE the bathroom. It's functional, it's clean, it's not falling apart, and it's even fairly aesthetically pleasing. It even has plenty of storage. However, it is easily our least favorite room in the house, beating out the torn up office for that honor. We don't really have a good reason for disliking the bathroom, other than that everything but the floor tile and sink cabinet is half-assed and/or cheap. We even had a nicer bathtub in our rental hovel...

So, for the sake of being able to take a bath again, and have an oasis in the chaos, we're seriously thinking about doing the bathroom.

Due to it being the only full bathroom in the house, the plumbing to the bathtub can't be disconnected for very long. We can shower at work if we have to, but it would be better if it didn't come to that. At least not for any length of time. Of course, we also don't know jack about plumbing. I can install a water filter, and Shayne can unclog a drain, but that's about the limit to our experience. We're going to have to hire this one out.

It's looking like every fixture in the room will be moved. I can't say that I'm thrilled with that, but the current layout sucks and doesn't leave us with much useable floor space. By moving the fixtures, it will open up the room and make it feel larger than it does now. It might also cause problems, since the long wall is an outside wall... Below are the current and expected floor plans. The boxes next to the tub and sink are ceiling-height cabinets.

We've got the basics figured out for the materials: beadboard wainscot, subway tile shower surround, 1" hex tile floor, pedestal sink, and a cast iron drop-in tub. I really wanted a clawfoot tub, but Shayne's dimensions apparently aren't standard enough for a standard tub. 14" of water in a 5' tub means that almost all of him will be out of the water, making a bath rather pointless. Kohler's Tea-for-Two tub is the deepest (19.5" of water at the overflow!) cast iron tub I can find that is under 6' long, so I'm hoping to find one of them on sale...!

8/23/2006

Happy Anniversary!

As of tomorrow, we'll have lived in the house for 1 year. We've owned it for a year and 1 month now, but we couldn't move in until August 24, 2005. Happy house anniversary to us!

Here is what we've accomplished in our first year:
  1. Removed the ugly shower door and replaced it with a rod and curtain
  2. Painted the basement
  3. Removed the carpet, wallpaper, and ceiling tiles from the living room and upstairs hall
  4. Repaired and skimcoated the plaster in the living room and upstairs hall
  5. Painted!
  6. Refinished the living room floor (twice)
  7. Installed an "invisible fence" to teach the dog where the yard boundaries are
  8. Tore out 4 yew bushes in the front of the house and replaced them with a raised flower bed
  9. Tore off and rebuilt the roof of the connector between the two garages
  10. Stripped and sanded lots of woodwork
  11. Tore out the carpet in the upstairs office and closet

It hasn't been a super-productive year, but we are learning as we go. With both of us working full-time jobs and having limited funds, I think we're doing okay.

Here is what we hope to accomplish in the year to come:

  1. Completely finish living room and purchase furnishings
  2. Remove paneling, wallpaper, laminate floor, and ceiling tiles from the dining room
  3. Repair dining room plaster and skimcoat
  4. Paint the dining room and install board and batten wainscoting
  5. Refinish dining room floor
  6. Install built-in cupboard
  7. Remove carpet, wallpaper, and ceiling tiles from the kitchen
  8. Strip, repair, and repaint the original kitchen cabinets
  9. Build new cabinets to match originals
  10. Reconstruct smaller original doorway between the dining room and kitchen
  11. Run new duct to the office in its original location

Sounds a little ambitious, doesn't it...?

We have a yard! And a garage!

Even thought I haven't been posting, we've been busy doing maintenance-type stuff here at the Prairie Box. Most importantly, we finally cleaned the garage. It's been a MESS since Shayne rebuilt the roof connecting the two garages, and we finally decided to do anything about it. That took about 4 hours on Saturday. Then, Shayne put together the wonderful grill that my mom bought us as an early Christmas present (since Shayne and I both have birthdays in December, Christmas in July is becoming something of a tradition...). I'm also in the process of weeding all of the flowerbeds one last time before we put down mulch. The front bed is done, and the large back bed is nearly so. The side flowerbed that borders our neighbors fence needs lots of help. It's been taken over by evil life-sucking vines and blackberry bushes. The utility easement on the north side of our property is also in need of help, but I think that might have to wait till spring or fall, since it's way too overgrown right now to even attempt. Since it's woods, though, it doesn't look bad, but I know it should be more open and less weedy. In spite of all the work that still needs to be done, the yard looks better now than it has all year. I'm going to plan better for next summer and make sure that my projects are wrapped up enough to work on the yard more and the interior less.

I've also been plugging away at the stairway. The railing is a bitch to strip, and I'm not sure if there's a way to make it go faster. I've been using steel wool and denatured alcohol to trip off the shellac and remaining paint flakes. As with everything worth doing, it is tedious and labor intensive. But it looks so much nicer without the paint!

We are having a cookout/open house on September 16, so we are going to be busting our butts until then to get the living room totally finished. We might not have our furniture by then, but I plan on having the woodwork, walls, and floors completely done. That gives us 3 and a half weeks to buckle down and "git 'er done!"