This is going to be quick, as I'm exhausted and need to do a few things and get to bed. But the big news of today is that the tub is in, has all of the plumbing installed to it, and the surround framed and walled with cement board. I was worried that the bathroom would look closed-in, like it did before, but even with the new wall, everything seems spacious. In fact, I'm amazed at how big the room looks in spite of a larger tub. It seems like the PPOs did everything they could to make the room look teeny - and succeeded.
Here's a peek:
We did decide to install the tub flush with the north (left) wall. Originally, the plan was to have some open shelving over there, but after consulting with T, it seemed that the space was too tight to be very functional. We opted to scoot the tub over and instead open up the area where the toilet is. Before it was very cramped and awkward-feeling, especially because there's a bump-out for the main drain in the corner. We'll now be able to have our freestanding shelving on the wall behind the tub (where the cement board is leaning), which will free up the walkway to get to the toilet. We also decided to place the sink directly across from the toilet in order to keep that walkway clear. I think it will feel more spacious if there is a fairly large area of open space around the tub. We'll do a mock-up of the layout before moving the plumbing, just to be sure, but I feel confident that it will work well as it was one of the layouts I had seriously considered before. I had discarded the idea because we'd have to either rip out the floor or kitchen ceiling in order to move the plumbing. But since the ceiling is already open... It's not an issue anymore.
Anyhoo... Tomorrow T will frame the soffit and possibly start on the tiling for the tub surround. He may also start laying the cement board for the floor, but I'm a little fuzzy on the exact order of things now that we have a working shower again!
2/14/2012
2/13/2012
Bathroom remodel : Day 4 - The real work begins
I meant to post every day, but the little guy got sick, so I was spending most of my time trying to distract him from how miserable he was. We were up every hour all night, in spite of him sleeping in bed with me. That did help him not to cry when he woke up, but he was tossing and turning enough to keep waking me up. In spite of that, we have made some progress.
On Saturday, Shayne ripped up the floor. Miracle of miracles, there was no plywood, so we just had the hardboard to tear out. That was easy, since it breaks off in chunks. We found a little more water damage, but that wasn't a big surprise. The boards were really creaky, though, so we put down plywood near the toilet to walk on. I didn't want to end up falling into the kitchen. And I put a nightlight in there for my midnight trips to the potty. We keep a small light on in the kitchen overnight, and it was just too creepy to see the light shining up between the floorboards and into the pitch black bathroom.
Sunday I tackled the wallpaper. And, like every other room in the house, the m$&*@r f@$%ing PPOs put up wallpaper, painted it, and then put up even more. 3 layers over the painted layer, which was of course put directly onto the unprimed drywall. It's an absolute BEAST to get off, worse even than the living room. Thankfully I only need to get 2 small walls done, but I was hoping to be done yesterday. Yeah, that didn't happen. I think that we probably will end up pulling down the bit of remaining drywall. The bottom is really crumbly, and we're discussing with T (our contractor) whether or not it's worth the effort. My idea of skimming the original plaster may yet happen...
Here are a few pics from the weekend:
This morning, T showed up and ripped out the tub and surround. I think the sound of that cheap, horrible tub being sawed into pieces was one of the most beautiful things I've ever heard. T is my hero. Underneath we found some lovely plastic tiles from a '50s remodel:
And once the tub was chopped up and removed, we got to see what was holding it up. Sorry for the blurry pic, but all of the lumber was pressure-treated decking. It wasn't even nailed or screwed together, just stacked up for the tub to rest on. And it was just on the one side. It's a miracle that tub stayed up and didn't fall off its little pillar. No wonder it always felt flimsy and we couldn't get caulk to stay put! But, there was no water damage anywhere. Yay!
Behind the cabinet next to the tub, we "found" the original attic access. I knew it was there, but I thought it was in the ceiling. I also thought it would be less... cute. Okay, so maybe "cute" isn't the right word, but it definitely had more character than the hole in the ceiling I was expecting. T was awesome and pulled the frame and door off completely intact. I may reuse it in the kitchen for a spice cabinet. If I can get all that glue off. Thank you again, K, for all of your wonderful work on this house... :(
I had to leave to go to work, but Shayne says that as of 4:30 the new tub is in the bathroom! More to come...
On Saturday, Shayne ripped up the floor. Miracle of miracles, there was no plywood, so we just had the hardboard to tear out. That was easy, since it breaks off in chunks. We found a little more water damage, but that wasn't a big surprise. The boards were really creaky, though, so we put down plywood near the toilet to walk on. I didn't want to end up falling into the kitchen. And I put a nightlight in there for my midnight trips to the potty. We keep a small light on in the kitchen overnight, and it was just too creepy to see the light shining up between the floorboards and into the pitch black bathroom.
Sunday I tackled the wallpaper. And, like every other room in the house, the m$&*@r f@$%ing PPOs put up wallpaper, painted it, and then put up even more. 3 layers over the painted layer, which was of course put directly onto the unprimed drywall. It's an absolute BEAST to get off, worse even than the living room. Thankfully I only need to get 2 small walls done, but I was hoping to be done yesterday. Yeah, that didn't happen. I think that we probably will end up pulling down the bit of remaining drywall. The bottom is really crumbly, and we're discussing with T (our contractor) whether or not it's worth the effort. My idea of skimming the original plaster may yet happen...
Here are a few pics from the weekend:
![]() |
| Water damage around the toilet. I love how you can see daylight through the floorboards. Yeek! |
This morning, T showed up and ripped out the tub and surround. I think the sound of that cheap, horrible tub being sawed into pieces was one of the most beautiful things I've ever heard. T is my hero. Underneath we found some lovely plastic tiles from a '50s remodel:
And once the tub was chopped up and removed, we got to see what was holding it up. Sorry for the blurry pic, but all of the lumber was pressure-treated decking. It wasn't even nailed or screwed together, just stacked up for the tub to rest on. And it was just on the one side. It's a miracle that tub stayed up and didn't fall off its little pillar. No wonder it always felt flimsy and we couldn't get caulk to stay put! But, there was no water damage anywhere. Yay!
Here we are all cleaned up. T removed all of the loose flooring as well as the scary deck scraps. He'll patch with plywood once the plumbing is squared away. We're moving the tub over a few inches so that there's more room by the toilet.
Behind the cabinet next to the tub, we "found" the original attic access. I knew it was there, but I thought it was in the ceiling. I also thought it would be less... cute. Okay, so maybe "cute" isn't the right word, but it definitely had more character than the hole in the ceiling I was expecting. T was awesome and pulled the frame and door off completely intact. I may reuse it in the kitchen for a spice cabinet. If I can get all that glue off. Thank you again, K, for all of your wonderful work on this house... :(
I had to leave to go to work, but Shayne says that as of 4:30 the new tub is in the bathroom! More to come...
2/12/2012
2/10/2012
Bathroom remodel: Day 1 - demolition
What a long day. I feel bad saying this, as Shayne did pretty much all of the work. I made a trip to Lowes and picked up all of our fixtures and most of the tile. I also helped clean up. Shayne took care of all the physical labor and got the project rolling.
Thanks to him, the bathroom remodel has started with a day of demolition. We are very conservative about what we remove, and we try to save the original whenever possible and practical. Out of the 4 walls, a floor, and a ceiling in the bathroom, we took one wall down to the studs. We are leaving the others alone, as they are in good condition. Sadly, they are sheetrock over the plaster. I had contemplated ripping out the sheetrock only, then repairing the plaster underneath. But in the end, I couldn't find a compelling reason for the extra work. The sheetrock, while obviously not original, is in good shape. It would be wasteful to rip it out just because I'd prefer plaster. The wall that we did remove will house the new water supply lines for the sink. It also had the electrical in it, which (as expected) was not up to code. K, the PPO, had jury-rigged the GFCI outlets. We found a junction box in the wall where it was just directly hooked to the old knob and tube. I was disappointed that the man hadn't properly wired a room he had remodeled, but not at all surprised. Par for the course; we've seen enough of his "handiwork" by now to know what to expect.
In addition to his incompetence at wiring, K was also not so great with drywall. He only put up sheetrock in the places that would be visible, so there was none behind the vanity or the floor-to-ceiling cabinet in the corner. Not even on the ceiling. That man was a cheapskate! I'm expecting that we'll find the same thing behind the shower and adjoining cabinet when we remove it on Monday.
While today was really productive, I also found it really demoralizing. I know that demo is the low point because you are taking something that is functional, though not particularly attractive, and making it ugly and temporarily useless. I know that the bathroom I've envisioned for YEARS now is finally on its way to appearing in my house. I know that in 2 weeks, we'll be just about finished, since we're hiring someone else to do the work instead of learning as we go and slogging our way through on sheer willpower. But after we demo (and by "demo" I mean everything from ripping up carpet to tearing down walls), I get this overwhelming feeling of, "Oh shit, what did we just do?" I'm not energized or excited to be starting. I'm mentally tired and sad. This is the point where I can't see the finished product and just wonder how in the heck it's all going to work out. But it will. It always does. But I don't know many people who would be excited to have a bathroom that looks like this (though at least now the dust has settled!):
Here's what we started with:
I will say this: having the corner cabinet and clunky vanity gone has made the room seem so much bigger. Obviously, it looks like hell right now, but I feel like we knocked out a wall or something. It's that dramatic.
Stay tuned for more tomorrow, after we remove the hardboard and plywood underlayment.
Thanks to him, the bathroom remodel has started with a day of demolition. We are very conservative about what we remove, and we try to save the original whenever possible and practical. Out of the 4 walls, a floor, and a ceiling in the bathroom, we took one wall down to the studs. We are leaving the others alone, as they are in good condition. Sadly, they are sheetrock over the plaster. I had contemplated ripping out the sheetrock only, then repairing the plaster underneath. But in the end, I couldn't find a compelling reason for the extra work. The sheetrock, while obviously not original, is in good shape. It would be wasteful to rip it out just because I'd prefer plaster. The wall that we did remove will house the new water supply lines for the sink. It also had the electrical in it, which (as expected) was not up to code. K, the PPO, had jury-rigged the GFCI outlets. We found a junction box in the wall where it was just directly hooked to the old knob and tube. I was disappointed that the man hadn't properly wired a room he had remodeled, but not at all surprised. Par for the course; we've seen enough of his "handiwork" by now to know what to expect.
In addition to his incompetence at wiring, K was also not so great with drywall. He only put up sheetrock in the places that would be visible, so there was none behind the vanity or the floor-to-ceiling cabinet in the corner. Not even on the ceiling. That man was a cheapskate! I'm expecting that we'll find the same thing behind the shower and adjoining cabinet when we remove it on Monday.
While today was really productive, I also found it really demoralizing. I know that demo is the low point because you are taking something that is functional, though not particularly attractive, and making it ugly and temporarily useless. I know that the bathroom I've envisioned for YEARS now is finally on its way to appearing in my house. I know that in 2 weeks, we'll be just about finished, since we're hiring someone else to do the work instead of learning as we go and slogging our way through on sheer willpower. But after we demo (and by "demo" I mean everything from ripping up carpet to tearing down walls), I get this overwhelming feeling of, "Oh shit, what did we just do?" I'm not energized or excited to be starting. I'm mentally tired and sad. This is the point where I can't see the finished product and just wonder how in the heck it's all going to work out. But it will. It always does. But I don't know many people who would be excited to have a bathroom that looks like this (though at least now the dust has settled!):
![]() | ||
| Note how the drywall doesn't extend much past the window... Also the layers of flooring: linoleum over hardboard over plywood. Awesome. |
![]() |
| See the hanging junction box where the new wire connects to the old knob and tube? The new PVC is our work from last summer, which is why the other side of the wall is open as well. |
![]() |
| The angle isn't the same, so you can't see the HUGE floor-to-ceiling corner cabinet |
Stay tuned for more tomorrow, after we remove the hardboard and plywood underlayment.
1/14/2012
The lost art of hospitality
I've been thinking a lot about how our social lives will change when I am no longer working full time. So much of my social interaction takes place at work; I rarely go out, I prefer one-on-one or small group interaction, and being on second shift makes it difficult to coordinate with others. And while I consider myself a homebody, I know that I will miss interacting with some of my co-workers on a regular basis. Right now, any need for additional socializing is met by meeting a friend or family for a meal at a restaurant. But that just won't be possible as often on a single income. Which got me thinking...
Why don't people have others over for dinner anymore? Maybe it's just the folks that I tend to interact with, but it seems that we rarely open our homes to others, even the people we are closest to. Although we have my mom and my in-laws over for dinner at holidays or birthday celebrations, and we usually have a big cook-out in the summer, we've never invited friends to just come over to have dinner.
Why not? I thought I'd be able to cone up with a lot of reasons not to have people over, as it seems to be somewhat anxiety-producing for a lot of people. But what it really boils down to is that my house isn't as organized as I wish it was. And every single person I know has the same thoughts about their house. But would a dinner experience be ruined if there were a few odds and ends out of place? When you go to someone's house, do you care if they still have a Christmas wreath up in March? As long as it is reasonably clean, the food is edible, and your host/hostess is welcoming, does anything else really matter?
I want our home to be a gathering place for family and friends. I want my children to grow up knowing how to treat guests properly. I want to be able to socialize without having to go somewhere, do something, or spend money. I don't want to use my house just as a place to sleep.
And so, this year, I'm going to open my home. In spite of its imperfections, its clutter, and my own anxieties, I'm going to try to have someone (besides family) over for dinner once every other month. I'm hoping that it will increase my satisfaction with my house, and help me to build stronger relationships with my friends that aren't dependent on my workplace. And maybe it'll even save me a bit of money and help me to keep on-track organizing and simplifying my home.
Subscribe to:
Posts (Atom)